注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

Daliute

 
 
 

日志

 
 

Mer Bleue by DROPS Design  

2016-02-12 06:58:04|  分类: 默认分类 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |
Mer Bleue by DROPS Design - Daliute -
 
GARTER ST (back and forth):
K all rows. 1 ridge = K2 rows.

PATTERN:
See diagrams A.1 to A.4. The diagrams show all rows in pattern seen from RS.

MID ST:
Work mid st in stockinette st on all rows with stockinette st in diagram, but on rows in diagram that are worked K from WS work mid st also like this.

STRIPES:
* 4 rows shoreline, 2 rows off white, 10 rows shoreline, 2 rows off white *, repeat from *-*.

TIP FOR CHANGING YARN:
When 1 ridge off white has been worked, cut and fasten the yarn. The strand in shoreline can follows upwards but make sure to avoid a tight strand. The fastening of the strand must not be tight either.
----------------------------------------------------------

SHAWL:
The shawl is worked back and forth on circular needle to make room for all the sts. Worked from neckline mid back and down.

Cast on 7 sts on circular needle size 4 mm / US 6 with shoreline. Insert 1 marker in the 4th st (= mid st) and move it upwards when working. Work diagram A.1 as follows: Work 2 edge sts in GARTER ST - see explanation above, A.1 over 1 st, 1 st in stockinette st (= mid st), A.1 over 1 st and 2 edge sts in garter st = 11 sts. Continue with A.1 on each side of mid st (work mid st in stockinette st in entire A.1), when diagram has been worked, 1 time vertically, there are 43 sts on row (i.e. 21 sts on each side of mid st). REMEMBER THE KNITTING GAUGE

Then work STRIPES – see explanation above and pattern as follows: NOTE: READ TIP FOR CHANGING YARN!
Work according to diagram A.2-A.4 as follows: 2 edge sts in garter st, A.2 over 1 st, A.3 over 17 sts, A.4 over 1 st, K 1 (= MID ST - see explanation above), A.2 over 1 st, A.3 over 17 sts, A.4 over 1 st and 2 edge sts in garter st. When diagrams have been worked 1 time vertically, there are 111 sts on needle (i.e. there are 55 sts on each side of mid st) and there is now room for 1 more repetition of A.3 on each side of A.3 on each side of shawl. Continue to work according to A.2-A.4 until diagrams have been worked 6 times in total vertically = 451 sts. Then work the first 6 rows in A.2-A.4. The stripes are now done, and continue in off white until finished measurements. Continue with the remaining 12 rows in diagram. Then work A.2-A.4 1 more time vertically.
There are now 587 sts on needle (i.e. 293 sts on each side of mid st). Loosely bind off as follows with off white: * bind off 3 sts, 1 YO, bind off YO *, repeat from *-* the rest of row.

SHAPING:
Place the piece in lukewarm water until it is soaking wet. Carefully squeeze out the water - do not twist. Then roll the piece in a towel and squeeze to remove more water - the piece will now only be moist. Place the piece on a carpet or mattress - carefully stretch it out to measurements found at the top of pattern. Leave to dry. Repeat the process when the garment has been washed.

Diagram

= K from RS, P from WS
= K from WS, P from RS
= slip 1 st as if to K, K 1, psso
= K 2 tog
= 1 double YO between 2 sts. Drop the first YO off the needle on next row. Work the second YO as shown in diagram.
= 1 YO between 2 sts, work YO twisted on next row
= 1 YO between 2 sts, K YO on next row
Mer Bleue by DROPS Design - Daliute -
  评论这张
 
阅读(280)| 评论(4)
推荐 转载

历史上的今天

在LOFTER的更多文章

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017